The Town of Hempstead has announced that the parking lot enforcement of required permits will begin again on September 8, 2020. There is an on-line method for Town of Hempstead residents to obtain permits for the rear right bumper of their cars. Please see the link HERE.
At least six Seafords exist in the world: Seaford, on the south coast of England; Seaford, Delaware, and Seaford, Virginia; Seaford, Long Island, New York; Seaford, Victoria, Australia, and Seaford, South Australia, Australia. When using a search engine, please be aware of the six locations.
Showing posts with label Railroad station. Show all posts
Showing posts with label Railroad station. Show all posts
Saturday, August 22, 2020
Thursday, March 16, 2017
Rectangular parking stickers
This morning I picked up a Resident Commuter Parking Permit from the town clerk staff in Bellmore. The stickers are blue rectangles with punch holes for the last three numbers on the license plate or the word Van for Vanity plate. Apparently that may be intended to discourage resale of these permits. As usual, the sticker goes on the right side of the rear bumper.
---
The stickers will be sold at the Wantagh station in the early morning of March 21 and 22. Bring the vehicle registration to prove residency. The stickers are valid at four stations from Merrick to Seaford.
---
The stickers will be sold at the Wantagh station in the early morning of March 21 and 22. Bring the vehicle registration to prove residency. The stickers are valid at four stations from Merrick to Seaford.
Tuesday, July 7, 2009
New elevator and escalator at Seaford railroad station
Wednesday, February 25, 2009
Sunday, February 1, 2009
East end of LIRR platform now in service
-----
The elevator and escalator are not yet in service.
Tuesday, October 28, 2008
Seaford LIRR 1967 photos
A thread has developed on railroad.net concerning the Seaford station repairs. If you use the link below and then scroll a considerable distance down the discussion, you will find eight black-and-white photos from Dave Keller showing the construction of the elevated station while a temporary station was in place on ground level.
The link is here.
------
The same thread reminded us that the Seaford train service was moved to the elevated structure in two steps forty years ago: On October 22, 1968, the westward train service began to use the elevated platform. On November 1, 1968, eastward train service was moved upstairs. I note that this happened before the purchase of the M-1 fleet, so all cars had trap doors and steps. That explains why the photos of the temporary platforms show "low-level" platforms. Until this week forty years ago, passengers climbed onto trains. The steps on the coaches could be slippery in bad weather! When the new station was put in service, the platform was the height of the coach floor, and one merely had to step over the gap.
The link is here.
------
The same thread reminded us that the Seaford train service was moved to the elevated structure in two steps forty years ago: On October 22, 1968, the westward train service began to use the elevated platform. On November 1, 1968, eastward train service was moved upstairs. I note that this happened before the purchase of the M-1 fleet, so all cars had trap doors and steps. That explains why the photos of the temporary platforms show "low-level" platforms. Until this week forty years ago, passengers climbed onto trains. The steps on the coaches could be slippery in bad weather! When the new station was put in service, the platform was the height of the coach floor, and one merely had to step over the gap.
Wednesday, August 6, 2008
Seaford station work as of August 5, 2008
The reconstruction of the Seaford Long Island Rail Road station platform is being done in two halves of six-car lengths each. Three or four months ago, the eastern half was removed. Two stairways were demolished and the escalator removed. The most recent work seems to have been the replacement of the supports for the platform. By supports, I mean only those two-inch or so toppings that run parallel to the tracks and apparently will support new concrete slabs. Since the station was opened in 1968, the previous supports, made of steel, rusted and buckled, causing the platform slabs to heave irregularly. In the photo (link below), one can see a new horizontal concrete support replacing what was rusted steel.
See the photo here and also the rest of the album connected to it.
See the photo here and also the rest of the album connected to it.
Wednesday, April 2, 2008
Half of Seaford train station is closed
As of April 2, 2008, the east half of the Seaford train station is closed. Passengers must use the stairways at Jackson Avenue. The escalator is out of service for replacement. The ticket machines and the mail box have been relocated to the north side of the escalator. Passengers buying tickets will first have to walk east to the ticket office and machines, then west to Jackson Avenue to reach the six-car section of the platform that remains in use. Passengers traveling to Seaford must sit in the west six cars, as other car doors will not open at Seaford.
Subscribe to:
Posts (Atom)

